(I don't like it as once the spandex walling being removed, someone kitchen easily sighted from the Mosque. Six footer walling should be erected).
Bright sunny day at Kampong Raja Uda when at the same time Johore, Melaka, Negeri Sembilan and Pahang are flooded.
Wiring work and the some brick walling was in progress. Right and left perimeter fencing was being erected. The latest that was noticed was the water Pump House and a big hole being dug to accommodate the septic tank. Most surface area of structural buildings and pillars had been cement plastered.
Bearing weather condition, availability of hardware materials and completion of wiring system, painting work can commence. However, there are numerous essentials in hand to be address I presume, the mimbar woodwork deco, the mehrab, carpeting, public address system and the essential furniture for the Multipurpose Hall. I leave it to the relevant expertise.
Praise to Allah, insyallah come August 2011 the month of Ramadan, the kampong residents can utilize the Holy month of Ramadan in this new an elegant Mosque.
No comments:
Post a Comment