Thursday, February 2, 2012

KRU New Mosque as at 02 February 2012.

Mosque frontage Parking area.

The mini Tenaga Sub Station.

Mosque frontage.

Chief Mandure, Harun fixing the aluminum window frame.

Workers working on the Imam Pulpit.

Current position of the Mimbar & Mehrab.

Men working on the left side Mehrab.

No work on the Mimbar yet.

Ground level water reception tank. Pump house just beside.

Crusher run at the rear area.

Current scenario at the Mosque rear.

Women ablution area.

One of the lawn pole lighting.

Final touch on the covered walkway between Multipurpose Hall and the Mosque proper.

Men ablution area - no work.

Certain wall ceilings to be install.

Right Mosque frontage.

All set for premixing.

The status of the lone minaret.
Frontage wall concrete and steel fencing.

I was on site at 0930 hrs after brisk walking at Pandamaran Sports Complex just opposite the New Mosque Complex.

Today, 02.02.2012 they will be laying the premix. The Premix Layer and the Rollers was already on site waiting for the arrival of the first load of premix. At the rear, the tractors were still leveling the crusher run.

Inside the Mosque, the Craft Artiste were attending to the Mehrab and the Imam Pulpit. No sign of work at the Mimbar.

Workers were tiling the Women ablution room but the Men and VIP areas - there was no work in session.

Ceilings at certain area to be install.

The mini Tenaga Substation already in place and the ground level water tanks were already positioned. Final concrete flooring work at the covered walkway between the Multipurpose Hall and the Mosque proper was in progress.

Harun the Chief Mandore was fixing the aluminum glass window frame.

Someone on site told me, insyaalah the New Mosque should be ready at the end of March 2012. If it happened, alhamdullillah, if not, insyaalah we keep on waiting.

My prediction is still June 2012 plus minus two (2) months.

I hope the New Mosque Development Committee (?) is ready to overcome the teething problem during commissioning and they are also ready to equip the New Mosque. Since it is a brand new mosque, everything should be new. Negeri Selangor Berkebajikan should be able to provide the fund and they are also an expert of passing the sack around collecting funds. Rather odd having the latest Mercedes but the floor mat taken from the old Proton Saga.

No comments: